East Pont Des Mouton
East Pont Des Mouton was the finish line on a 36 million dollar investment by the Lafayette Consolidated Government in north Lafayette. The project consisted of replacing 1.5 miles of existing 2 lane asphalt roadway with 4 lane concrete boulevard. Siema’s work scope included installation of over 14,000 LF of subsurface drainage, importing or exporting over 65,000 cubic yards of dirt, 65,000 SY of stabilization and 4″ limestone base, and over 60,000 SY of 11 inch portland cement concrete paving.